Full Name: Neustadt-Glewe
Development Phase: Operational
Installed Capacity: 0.2 MW
Operational Capacity: 0.2 MW
Investment:
Completion Date: 2003
Location: Neustadt-Glewe
Country: Germany
Region: Europe and Middle East
Number of wells 2
Depth 2,200 - 2.300
Internal distance of the wells 1,500 m
Temperature 97B0C
Mineralization 220 g/l
Flow rate 125 mB3/h
Thermal output 10,7 MW
Geothermal energy use 6,5 MW
Heat supply 23,7 GWh/a
Geothermal energy use 22,2 GWh
Geothermal electricity generation 200 kW
Source: GTM
Name | Tech | Supplier | Install | Oper. | Year |
---|---|---|---|---|---|
Unit 1 | Binary | 0.2 | 0.2 | 1900 |
Login or sign-up for more plant details.